What are BIM Maturity Levels?
Here’s a quick breakdown of how the construction industry evolves with each BIM level:
✅ Level 0 – No Collaboration
Only 2D CAD drawings
Info shared via paper or PDF
Very basic and rarely used now
✅ Level 1 – Partial Collaboration
Mix of 2D drafting + 3D CAD
Data managed by contractor
Shared through a common data environment (CDE)
✅ Level 2 – Full Collaboration (File-Based)
Each stakeholder works on their own 3D model
Info shared via common formats (e.g., IFC, COBie)
Enables federated models with 4D & 5D data
✅ Level 3 – Full Integration (Open BIM)
Everyone works on a single shared model
Real-time collaboration via cloud
Includes 4D (time), 5D (cost), and 6D (lifecycle) data
🚀 BIM levels help AEC professionals reduce errors, save time, and improve teamwork!
👉 Read the full blog here: https://www.teslacad.co.uk/blo....g/what-are-bim-matur
#bim #buildinginformationmodeling #aecindustry #constructiontechnology #digitalconstruction
